| Lewiston, ME, United States |
 |
Project Features
Completion: 2009
- Architect: Foreside Architects, Portland, ME
- Engineer: Summit Engineering, Lewiston, ME
- General contractor: Herbert Construction, LLC, Lewiston, ME
- Design, fabrication, delivery and construction.
- 27,000 sq. ft. (180 ft. wide x 150 ft. long).
- Hangar door: 160 ft. wide x 35 ft. high.
- Will be used by Lufthansa to refurbish wide-body aircraft.
- First aircraft hangar project in the U.S.
- The building’s exterior is finished with metal cladding.
- The building’s structure is composed of Murox® shop-fabricated load-bearing wall panels as well as conventional steel structures fabricated by Murox® and assembled directly onsite.
- Five months from design to final construction.
- Erection began on August 28, 2008.
|
 |
|  |  |