Sobeys – Marystown, Newfoundland and Labrador

 
Canam was contracted by Sobeys to supply and erect the building envelope.

The BuildMaster approach allowed Dwight and the KDM Erectors crew to finish ahead of schedule, even though they had to deal with the weather in Newfoundland and Labrador and numerous schedule changes.

Listen as the foreman of the erector crew shares his first impressions of BuildMaster’s impact.

 
 
Project features

  • 50,000 sq ft (4,645 sq m)
  • Joists, steel deck, structural steel
  • 118 Murox wall panels
  • 2 mezzanines
Download Case Study PDF
Partners

  • Client: Sobeys Group
  • Architect: WHW Architects
  • General contractor: N.D. Dobbin
  • Steel fabricator: Marid Industries
  • Steel erector: KDM Erectors
Firming up the schedule
"Anything you can make more predictable on a construction site makes everybody happier and safer."

Streamlining efficiencies
"I like the new drawings. They’re clear. On this job, I had a separate drawing for my deck, showing me exactly where to lay each bundle, it really simplifies things."

Dwight Dellebuur
Foreman
KDM Erectors

 
 